Measuring the average thickness
Lay a long straightedge or level across the floor in several directions and measure the gap at the low spots. A line laser is faster: set up a grid about one metre apart, measure the distance to the laser line at each point and take the average.
Use the average thickness, not the deepest spot. Applying a 12 mm low spot to the whole room can easily double the amount you buy.
Usage per millimetre
The bag states usage, usually in kg per m² and mm. It depends on the density of the compound.
| Thickness | at 1.6 kg/m² per mm | for 12 m² |
|---|---|---|
| 3 mm | 4.8 kg/m² | 58 kg |
| 5 mm | 8.0 kg/m² | 96 kg |
| 10 mm | 16.0 kg/m² | 192 kg |
Before you pour
- Vacuum the substrate and prime it with the manufacturer's primer. Otherwise the screed pulls water out of the compound and it cracks.
- Fit edge insulation strips along all walls.
- Stay within the product's permitted thickness. Deep areas need a compound rated for thicker layers.
- Use exactly the water quantity on the label. Too much water leaves a soft surface.
The bag also says when the floor is walkable and ready for tiling. The job-site timer in TileWright reminds you.
Materials and waiting times under control
TileWright calculates leveler, adhesive and tiles in one project and sends a notification when the floor is walkable. Fully offline.
Download on the App StoreFrequently asked questions
How much self-leveler do I need per m²?
At 1.6 kg per mm it is 4.8 kg per m² for 3 mm and 8 kg per m² for 5 mm.
How do I work out the layer thickness?
Measure the gap to a straightedge or laser line at several points and average them. Don't apply the deepest spot to the whole room.
Do I need to prime before leveling?
Yes. Without primer the substrate draws water out of the compound, which weakens the bond and can cause cracks.